Kitchen remodels are exciting - until you realize the old wiring can't support a modern kitchen. That's exactly the situation we're working through here. A full gut renovation like this one exposes everything the walls have been hiding for years, and what we found made it clear: starting from scratch electrically was the only right call.
Here's what we're dealing with. The walls are opened up, the cabinets are stripped out, and we're running brand new circuits designed specifically for how this kitchen will actually be used. Dedicated circuits for the refrigerator, dishwasher, and microwave. Outlet placement mapped to where the countertops and appliances are going. Lighting circuits planned around the new layout - not the old one. Every decision is made before the drywall goes back up, because that's the only time you get to do it right without tearing everything apart again.
A lot of homeowners don't realize that kitchen remodels almost always require electrical upgrades to pass inspection. Older kitchens were never wired to handle modern load demands. Add a double oven, under-cabinet lighting, and a built-in coffee station to a 30-year-old circuit, and you've got a problem waiting to happen. We handle all of that planning upfront so nothing gets flagged at inspection and nothing gets left to chance.
That's the real value of bringing in a licensed electrician during a renovation - not just having someone pull wire, but having someone who understands how the finished space needs to function. We coordinate directly with the rest of the remodel crew so our rough-in work lines up perfectly with cabinet placement, appliance specs, and code requirements. No surprises. No rework.
If you're planning a kitchen renovation and haven't thought through the electrical side yet, that conversation needs to happen early. The wiring decisions made during rough-in affect everything that comes after.